How Can Value be Reinstated in the Built Environment? Excerpt 2 from 'Design to Value: The architecture of holistic design and creative technology.'

—treating components of construction as standardised products rather than one-off custom solutions.

Ibid.. Ibid.. Ibid.. https://ourworldindata.org/safest-sources-of-energy.For more information about the proposed strategy, see:.

How Can Value be Reinstated in the Built Environment? Excerpt 2 from 'Design to Value: The architecture of holistic design and creative technology.'

Repurposing Coal: how a P-DfMA approach will help coal-fired power stations fight climate change.Bryden Wood unveils digital platform for decarbonising electricity production by 2050Above - in this video, Architecture Director Steven Tilkin describes Bryden Wood's approach to designing a new type of prison [image MoJ].. An innovative approach from an innovative Ministry.The cycle of re-offending is a huge cost to the UK economy.

How Can Value be Reinstated in the Built Environment? Excerpt 2 from 'Design to Value: The architecture of holistic design and creative technology.'

A 2016 study of a group of offenders who re-offended within 12 months of release from prison estimated that the total economic and social cost of reoffending was £18.1 billion..The Prison Estate Transformation Programme (PETP) was a programme of 10,000 ‘new for old’ adult prison places across six sites (plus one new house block) at an estimated value £1.3 billion.

How Can Value be Reinstated in the Built Environment? Excerpt 2 from 'Design to Value: The architecture of holistic design and creative technology.'

The full PETP programme was retired and superseded by a new programme, but, at the time, it provided an opportunity to develop a new type of prison environment using a platform based Design for Manufacture and Assembly (DfMA) approach – one whose core purpose was to increase the likelihood of rehabilitation and reduce re-offending rates.

This was used in the design of the two prisons being delivered under PETP (HMP Five Wells at Wellingborough and at Glen Parva) and formed the basis for the current capacity programme.How to find sites with reliable power.

How to shorten overall programme durations.How to develop the expertise and constraints of the supply chain, including integrators to get them “on the curve”!.

How to find outlets for waste heat.How to deal with fragmentation across Europe in regulations/standards.